Excell Storage
ANSER provided a complete, turn-key electrical installation for a three-level concrete precast storage facility.
ANSER provided a complete, turn-key electrical installation for a three-level concrete precast storage facility.
ANSER had the privilege to complete the electrical work for BC Broiler Hatching Commission and BC Egg Marketing Board’s new shared office space located on the second floor of this building in Abbotsford, BC. ANSER is proud to have installed all the electrical work including state of the art lighting for this project.
We completed the electrical installation for a 300ft barn extension renovation for a broiler breeder farm. The barn was outfitted with chain feed loops, nest boxes, ventilation, lighting, and a custom feed winching system. We worked with Precision Farm Supplies to install a Horizon environmental control system.
ANSER was contracted by Abbotsford School District to do a service upgrade at a local high school. The project involved the removal of an existing 15kV unit sub and a 120/208V main distribution center located within a vault in the middle of the school. The existing equipment was replaced by a 800A 600V main service
We completed the installation of a 900kW Simpower Genset for a local mushroom farm in Langley, BC. The scope of the job included the wiring of the generator controls and programming, the wiring of the generator to the transfer switch, setup of the fuel system, and commissioning the generator with a 2 hour load test.
We completed the full electrical installation with Valli Equipment for a modern layer barn in Abbotsford, BC. The layer barn was outfitted with United Agri’s automated systems for environmental control, monitoring, feed distribution, egg collection, manure management, and ventilation. We worked alongside Elite Installations and Petson Equipment Installers to successfully complete the project.
We completed the electrical wiring for an aviary free range, organic layer barn which included the installation of a Fancom environmental control system, feed system, egg collection system, manure management system, surveillance camera system for monitoring barn operations, and lighting throughout the barn.
We completed the electrical wiring for two single level broiler barn facilities including the installation of a Choretime CT3 environmental control system, feed system, and lighting throughout the barn.
Bradner Organic Feed Mills in Ashcroft, B.C. added a complete feed milling system with central controls, and programmable logic controllers (PLC’s). Anser worked alongside the ownership of Bradner Farms to complete this extremely time sensitive project. This project was a complete custom installation and ANSER continues to maintain this facility today.
Anser was tasked with providing a complete electrical installation of this custom home in Abbotsford, B.C. The project included carefully planned lighting for cabinetry and shelving while working with an interior designer to complete the entire electrical system for this home.